Photos

An aerial of Blocks 1 and 2 facing west. Pictured is the concrete paving completion of Block 1 (between Washington Avenue and Jefferson Avenue), as well as Block 2 (Jefferson Avenue to Lincoln Avenue). Pedestrian fencing is placed in the middle of Block 1 to guide pedestrians to their destinations while new sidewalk is being installed on Block 1.