Phase 1A construction phasing map for the 4th Street Revitalization project.
previous next
Map of Phase 1A showing the roadway temporarily closed on 4th Street. The roadway is surrounded by pedestrian fencing, but sidewalks and street crossings in both the north-south and east-west directions are accessible to the public. Wayfinding signage is shown on the fencing to guide the public safely around the construction zone.
Lincoln Avenue and 4th Street Single-Lane Closure
Garfield and 4th Street Intersection Closure Map
Xcel Temporary Single Lane Closure Map
Block 5 Closure Map
Washington Avenue Closure Map
HIP Streets_Map & Schedule Exhibit.jpg
Phase 1A construction phasing map for the 4th Street Revitalization project.
Phase 1B construction phasing map for the 4th Street Revitalization project.
New post-and-panel exterior signage being developed for the 4th Street Revitalization project.
New exterior banner signage being developed for the 4th Street Revitalization project.
 Eye-level rendering of the 4th Street Revitalization project created by Russell + Mills Studios.
Parking Map: September 2025
Blocks 1 and 2 Concrete Paving
Parking Map: Oct. 13 - 18, 2025
Detour Darrin
2026 HIP Construction Schedule_Updated