Construction Progress

Ponderosa Drive

  • Continued installation of the 8-inch and 4-inch PVC waterline up Ponderosa Dr to the Namaqua Hills Pump Station. Crews finished installation of the 4-inch line but needed more time in this section than originally planned.
  • Disinfection and testing of the 4-inch waterline completed.

Pump station

  • Crews have begun excavating and installing pipe at the pump station.

Upcoming Work

Ponderosa Drive

  • Crews will complete installation of the 8-inch waterline up to the pump station.
  • Meter pits will be replaced as needed.
  • Disinfection and testing of the new 8-inch line will begin, with customers switching to the permanent system.
  • Paving has been rescheduled to the week of September 21st.

Pump station

  • Crews will finish connecting the new waterline to the pump station. Any customers affected by a water shutdown due to this work will be notified in advance.

Skyrock Road (south of Ponderosa Drive)

  • Waterline installation will begin after installation of the 8-inch waterline at Ponderosa completes. This is the final section of Phase 4.

Traffic Control

  • Traffic detours remain the same. Residents on Ponderosa Drive and Ponderosa Place should use the northern entrance to Skyrock Road, Juniper Lane and Morning Drive to avoid construction.
  • Sections of Skyrock Road and Ponderosa Drive remain closed to through traffic.
  • Xcel Energy contractors continue replacing electric poles, which may cause occasional delays.

Thank you for your patience as we continue making important improvements to your neighborhood’s water system.

Two large trench boxes support an excavated area with a work in one box and construction equipment in the background. View of work installing pipe to connect to the pump station.

Share Construction Update: August 31-September 11 on Facebook Share Construction Update: August 31-September 11 on X (formerly Twitter) Share Construction Update: August 31-September 11 on Linkedin Email Construction Update: August 31-September 11 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>