Weekly update 10/26/26 - 11/1/26

Hello Stakeholders!

Here are the project updates for the week of 10/26/26-11/1/26:

  • Block 5 (Garfield to Railroad Ave.)
    • Vehicle access will be limited to Garfield Ave. only.
  • Burlington Northern Santa Fe (BNSF) railroad crossing & 4th Street
    • Access across the BNSF railroad tracks is fully closed to vehicles
    • Pedestrian crossings at the tracks are shifting; please follow posted signage.
    • Installed concrete paving, sidewalk pavers, and boulder seat walls.
  • Block 4 (Cleveland to Railroad Ave.)
    • The block is open to traffic with limited southbound access at Railroad Ave. (east).
    • Installed concrete paving (intersection) and electric work.
  • Blocks 1, 2, 3 and 5
    • Permanent sculptures will be installed, which may require the temporary closure of parking spots to accommodate equipment.
  • Block 3 (Lincoln to Cleveland) (non-project related work)
    • Sidewalk closure at 225 E. 4th Street; please follow posted signage.
  • Painter’s Alley (non-project related work)
    • East side of the alley has been completed.
    • The new 5'x3' vault on the north side of the alley, along with the conduits routed from the 7'x14' vault, will be flow‑filled.
    • New conduits will be installed to serve 120 E 4th St, 118 E 4th St, 116 E 4th St, 112 E 4th St, and 104 E 4th St.

Weather permitting, work activities are Monday-Friday, 5:00 a.m. – 7:00 p.m. Please contact us with any questions at HipStreets@cityofloveland.org or 970-962-2524.

Thank you for your continued patience and support.